AONENG POWER

Manufacturing & R&D

Engineered in-house.
Built at scale.

AONENG brings product development, power electronics, software, manufacturing and testing under one technology group, giving customers direct access to the organisation behind the equipment.

28,000m²smart factory, Hangzhou
100,000+AC chargers a year
15,000+DC chargers a year
48%+technical & R&D staff
157+patents & copyrights
Core technology in-house

We build the parts others buy in.

Charging modules, power conversion, battery management and energy software are developed by our own engineers. That means one organisation answers for the whole system — from the power electronics inside the cabinet to the platform that runs the site.

157+ patents & copyrightsProvincial R&D CentreNational High-Tech EnterpriseZhejiang Software Enterprise
EMS & CloudEnergy management, charging management and remote O&M software.
In-house
BMSBattery monitoring, protection and control across the storage range.
In-house
PCS & energy storagePower conversion and controls for battery storage systems.
In-house
Charging modulesThe power-conversion core of our AC, DC fast and high-power chargers.
In-house
On the roadmapV2G / V2HMobile charging-storageLiquid-cooled high-power charging
How a charger is made

Seven steps, one roof.

From incoming parts to the shipping crate, every step happens in our own Hangzhou facility.

Technician preparing components at an assembly station
Step 01 / 07Incoming inspection
Technicians assembling chargers on the AONENG production line
Step 02 / 07Assembly
Assembly workstations on the AONENG factory floor
Step 03 / 07Software configuration
AONENG production floor with technicians assembling and testing charging cabinets
Step 04 / 07Electrical testing
AONENG production line
Step 05 / 07Functional verification
AONENG charger production floor with finished AC chargers
Step 06 / 07Final QC
AC chargers packed and ready for dispatch in the warehouse
Step 07 / 07Packing & dispatch
People behind production 48%+

of our workforce works in technical and R&D roles.

Engineers, test technicians and assembly teams who build, verify and keep improving every product — and who join technical discussions on customer projects.

AONENG service technician working on a charging cabinet at a bus depot
Field service
Technicians assembling chargers on the AONENG production line
Test bay
AONENG showroom with charger displays and a live monitoring video wall
R&D centre
28,000 m²smart factory floor area
100,000+ ACcharging units a year
15,000+ DCcharging units a year
50+export markets from one manufacturing base
7international offices, including Dammam
Quality & testing

Reliability starts before deployment.

Factory quality control, international product approvals and independent type testing — five checkpoints between a part arriving and a charger reaching site.

Checkpoint 01Incoming inspection

Key components are verified before they enter production.

Checkpoint 02Assembly & process control

Consistent production procedures across charging and power-system assembly.

Checkpoint 03Electrical & functional testing

Safety, communication and operating functions verified before release.

Checkpoint 04Market & environment fit

Design and certification matched to the operating environment and destination market.

Checkpoint 05Independent type testing

Relevant product families tested by independent laboratories.

AONENG production floor with technicians assembling and testing charging cabinets
Final inspection and electrical testing · Hangzhou
Independent type testing

Tested by bodies we don’t control.

Relevant product families go through type testing with independent laboratories and programmes.

KEMACEPRISGEPRISEARICCICTLC
Certifications & compliance

Built for international markets.

Product certifications

Approvals that let a specific charger or storage model be sold and installed in a specific market.

Each product page shows only the certificates that apply to that exact model and market.

Request certification documents
SASOSaudi Arabia
CEEuropean conformity
CBIECEE international scheme
PTBGermany · billing-grade metering
TR25Singapore · EV charging standard
cTUVusNorth America · safety
ETLNorth America · safety
Module BEU type examination
See it for yourself

Meet the people behind the equipment.

Factory visits, engineering discussions and project-specific technical coordination can be arranged through our commercial team.

FAQ

Questions about how we build

Does AONENG manufacture its own chargers?

Yes. AONENG operates a 28,000 m² smart manufacturing facility in Hangzhou.

What technologies are developed in-house?

Charging modules, PCS, BMS and EMS are developed in-house as core technologies.

What is the annual production capacity?

100,000+ AC charging units and 15,000+ DC charging units per year.

Can customers access factory and technical teams?

Factory visits, engineering discussions and project-specific technical coordination can be arranged through the commercial team, subject to project scope and availability.