AONENG POWER

Products / Ultra-Fast Charging

High power.
Built for high throughput.

AONENG high-power charging platforms are designed for highway corridors, charging hubs, major developments and other sites where charging speed and utilisation matter.

AONENG Single-gun AC wallboxAONENG Floor-standing AC pillarAONENG 40/60 kW dual-gun DC chargerAONENG 120–360 kW ultra-fast DC chargerAONENG Split DC group charging power cabinet
3.5 kW → 1.6 MWEV charging range
101 kWh+LFP storage, scaling to multi-MWh
100,000+ ACcharging units a year
15,000+ DCcharging units a year
Installation
Outputs

Showing 1 product

Environmental engineering

Built for real operating conditions.

Ratings vary by platform. Model-specific environmental specification is provided during technical evaluation.

+55°CUpper specified operating range on key charging platforms
IP65/ IP55Selected AC platforms / commercial and ultra-fast platforms
CCS2Primary regional vehicle interface · Type 2 on AC
Multi-layer protectionOver- and under-voltage · overcurrent · overtemperature · surge · grounding · leakage · emergency stop

Approved per model and market — never as a blanket claim.

Certifications & compliance →

Product approvals in the AONENG portfolio

SASOCECBPTBTR25cTUVusETLModule B

Each product page shows only the approvals that apply to that model.

Charging communication on DC models

DIN 70121ISO 15118OCPP 1.6J
FAQ

Ultra-fast questions

High-power output, cooling and site requirements.

Does a 360 kW charger always deliver 360 kW to the vehicle?

No. The vehicle must be able to accept that power at its current battery voltage, state of charge and thermal condition.

Why does current matter on a high-power charger?

Power is determined by voltage and current. Higher current enables more power at a given battery voltage but increases cable and thermal-management requirements.

Can two vehicles use the charger?

Dual-connector operation is available, with current and power behaviour depending on the model and vehicle conditions.

Is 800 V vehicle architecture required?

No. The platform supports a broad DC voltage range, but 800 V vehicles can use high power with lower current than lower-voltage vehicles at the same kW.

What sites are best suited to ultra-fast charging?

Highway corridors, public fast-charging hubs, high-utilisation commercial sites and fleet operations with short turnaround requirements.

Sizing a site? Our engineers will configure it with you.