AONENG POWER
Illustration

Solutions / Commercial & Destinations

Charging that fits the destination.

Site study

Charging matched to how long the visitor stays, with the access and billing a commercial site needs.

Book a site study

The right charger depends on how long people stay. Hotels, offices, retail centres and universities often need a mix of AC charging for longer dwell times and selected DC charging for faster turnaround.

Power is wasted on long stays

A guest parked for hours does not need the fastest charger on the site.

Capacity is already committed

The building has a supply, and charging has to live inside what is left.

Someone has to be billed

Staff, guests and tenants are not the same user, and should not be charged alike.

Reference architecture

How the system fits together.

The software layer sees every part of the site; the hardware below it moves the energy from the connection to the vehicle.

EMS · Smart Energy CloudSchedules sessions · holds the site limit · remote O&M
01Grid connectionLimit agreed with the network operator
02 · optionalStorage buffer125 kW / 261 kWh cabinets cover peaks
03Power cabinet240 kW–1.6 MW shared across terminals
04Charging pointsWhere vehicles connect
Digital operations

Access, tariffs and reporting

Operate

Monitor every charger, session and fault from one place.

Manage

Users, tariffs, access rules and multi-site visibility.

Integrate

OCPP to a CPO backend, or our platform end to end.

Monetise

Billing, reporting and the data behind utilisation.

Explore Software & EMS
AONENG Smart Energy Cloud Live
  • Overview
  • PV
  • Energy Storage
  • Charging
  • Load
  • Alarms
3.24MWPV generation+12%
2.61MWEnergy storage+8%
1.28MWCharging load+15%
4.83MWSite load+6%
0.21MWGrid import-9%
Power trendToday
Site loadPVMW
52.50
00:0006:0012:0018:0024:00
Equipment91% normal
  • Normal62
  • Warning4
  • Fault2
  • Offline0
Energy today28.6 MWh
  • PV12.4
  • Storage6.8
  • Charging5.1
  • Load4.3
Illustration of the Smart Energy Cloud interface. Figures shown are representative of a single site.
Project delivery & technical validation

From site study to lifecycle support.

01Site study
02Engineering design
03 · gateFactory acceptance
04Delivery
05 · gateSite acceptance
06Commissioning
07Training
08Lifecycle support
RemoteMonitoring, diagnostics, fault alerts, remote reset and OTA.
Regional supportConfiguration, fault analysis and technical response.
On-siteInspection, maintenance and component replacement.
Factory escalationEngineering diagnosis, firmware and component support.
FAQ

Destination questions

Specifying charging for guests, staff and tenants.

Are AC chargers suitable for hotels?

Yes. Hotels are a strong AC charging application because guest vehicles often remain parked for several hours or overnight.

When should a commercial site use DC charging?

DC charging is useful where drivers need a faster turnaround or where the site wants to serve shorter visits.

Can the site combine AC and DC chargers?

Yes. Mixed AC and DC sites are common when different users have different dwell times.

Can charging be controlled by RFID?

RFID is available across relevant AONENG charging platforms; exact access options depend on the selected model.

Can the chargers be monitored remotely?

Connected AONENG chargers can be integrated with charging-management software for remote operational visibility.

Start a project

Plan your site

From a single charging site to a fleet depot, energy-storage system or high-power charging network, our team can help define the right solution.