Ladepark AM — integrated charging & storageGermany

AONENG’s German Ladepark reference combines high-power DC charging, AC destination charging and on-site energy storage in one site architecture.

Ladepark AM charging and storage site entrance, Germany
ClientLadepark AM
LocationGermany
ApplicationPublic charging park
Hardware360 & 180 kW DC, 22 kW AC
StatusDelivered
01 — The challenge

A charging hub serving very different dwell times needed high power without a grid connection sized for the peak.

02 — The solution

High-power DC and AC destination charging with on-site energy storage integrated into the same architecture.

360 kWUltra-fast DC180 kWHigh-power DC22 kWAC destination
03 — The result

A working reference for hubs that combine different dwell times and an on-site energy requirement.

Site conditions

What the equipment works in.

Mixed dwell timesOn-site storagePublic access

Supported in-region from the AONENG POWER office in Dammam, with factory escalation from Hangzhou.

FAQ

About Ladepark AM

Charging, storage and how they work together.

What charging powers are used at the Ladepark project?

The approved reference lists 360 kW and 180 kW DC charging plus 22 kW AC charging.

Does the project include battery storage?

Yes. The charging site is integrated with on-site energy storage.

Why combine AC and DC charging?

Different charger power levels can serve vehicles with different dwell times and charging requirements.