AONENG POWER

Solutions / Industrial & Logistics

Energy and charging for high-demand sites.

Site study

Charging, storage and energy management across a working site, coordinated rather than bolted on.

Book a site study

Industrial and logistics sites increasingly combine fleet charging, renewable generation and large electrical loads. AONENG brings charging, battery storage and energy management together so the site can be designed as one energy system.

Charging is one load of many

It competes with process equipment that cannot be interrupted.

Peaks set the tariff

The site pays for its worst quarter-hour, not its average.

Material movement never stops

Yard equipment charges between tasks, not overnight.

Reference architecture

How the system fits together.

The software layer sees every part of the site; the hardware below it moves the energy from the connection to the vehicle.

EMS · Smart Energy CloudSchedules sessions · holds the site limit · remote O&M
01Grid connectionLimit agreed with the network operator
02 · optionalStorage buffer125 kW / 261 kWh cabinets cover peaks
03Power cabinet240 kW–1.6 MW shared across terminals
04Charging pointsWhere vehicles connect
Digital operations

One view of every load

Operate

Monitor every charger, session and fault from one place.

Manage

Users, tariffs, access rules and multi-site visibility.

Integrate

OCPP to a CPO backend, or our platform end to end.

Monetise

Billing, reporting and the data behind utilisation.

Explore Software & EMS
AONENG Smart Energy Cloud Live
  • Overview
  • PV
  • Energy Storage
  • Charging
  • Load
  • Alarms
3.24MWPV generation+12%
2.61MWEnergy storage+8%
1.28MWCharging load+15%
4.83MWSite load+6%
0.21MWGrid import-9%
Power trendToday
Site loadPVMW
52.50
00:0006:0012:0018:0024:00
Equipment91% normal
  • Normal62
  • Warning4
  • Fault2
  • Offline0
Energy today28.6 MWh
  • PV12.4
  • Storage6.8
  • Charging5.1
  • Load4.3
Illustration of the Smart Energy Cloud interface. Figures shown are representative of a single site.
Project delivery & technical validation

From site study to lifecycle support.

01Site study
02Engineering design
03 · gateFactory acceptance
04Delivery
05 · gateSite acceptance
06Commissioning
07Training
08Lifecycle support
RemoteMonitoring, diagnostics, fault alerts, remote reset and OTA.
Regional supportConfiguration, fault analysis and technical response.
On-siteInspection, maintenance and component replacement.
Factory escalationEngineering diagnosis, firmware and component support.
FAQ

Industrial questions

Material movement, peak demand and on-site storage.

Can AONENG support both charging and BESS at the same site?

Yes. The portfolio includes integrated charging, storage and EMS configurations.

Is the equipment suitable for dusty environments?

Relevant AONENG charging platforms are rated from IP54 to IP65, depending on the product.

Can storage be integrated with solar?

Yes. AONENG supports PV-storage-charging architectures with EMS-based coordination.

Can the system support future fleet expansion?

The site can be designed around phased capacity growth, subject to the electrical and civil infrastructure selected at the start.

Start a project

Assess your load

From a single charging site to a fleet depot, energy-storage system or high-power charging network, our team can help define the right solution.