AONENG POWER

Projects / China / Zhuhai Heavy-Truck Energy Station

Case study · Heavy-duty fleet

Zhuhai heavy-truck energy stationZhuhai, China

AONENG’s heavy-duty Zhuhai reference combines megawatt-scale group charging with 400 kW DC charging for electric trucks.

Group-charging cabinet and dispensers at the Zhuhai station
ClientZhuhai Heavy-Truck Energy Station
LocationZhuhai, China
ApplicationHeavy-duty fleet
Hardware1.2 MW group charging
StatusDelivered · December 2025
01 — The challenge

Electric heavy trucks need replenishment at a power level a conventional charging site cannot reach.

02 — The solution

A megawatt-scale group charging system with 400 kW DC charging supporting the wider site.

1.2 MWGroup charging400 kWDC chargersHeavy dutyVehicle class
03 — The result

High-power replenishment for heavy trucks in a demanding fleet environment.

Dec 2025Delivered
Site conditions

What the equipment works in.

Heavy vehiclesMegawatt scaleContinuous duty

Supported in-region from the AONENG POWER office in Dammam, with factory escalation from Hangzhou.

FAQ

About the Zhuhai station

Heavy-vehicle charging and group architecture.

What is the main system power?

The approved project material lists a 1.2 MW group charging system.

Are 400 kW chargers also used?

Yes. 400 kW DC chargers are part of the documented site.

What vehicle segment does the project serve?

Heavy-duty electric trucks.

Start a project

Plan a heavy-duty station

From a single charging site to a fleet depot, energy-storage system or high-power charging network, our team can help define the right solution.