Charging designed into the development.

Site study

Charging designed into the development, with capacity reserved for the phases that follow.

Book a site study

For residential compounds and mixed-use developments, EV charging should be planned as part of the electrical and parking infrastructure rather than added one charger at a time after occupancy.

Retrofitting costs more

Cabling a finished building is far dearer than providing for it at design stage.

Demand arrives gradually

A handful of bays today becomes most of the car park within the building’s life.

Shared parking is contested

Residents, visitors and commercial tenants compete for the same spaces.

Reference architecture

How the system fits together.

The software layer sees every part of the site; the hardware below it moves the energy from the connection to the vehicle.

EMS · Smart Energy CloudSchedules sessions · holds the site limit · remote O&M
01Grid connectionLimit agreed with the network operator
02 · optionalStorage buffer125 kW / 261 kWh cabinets cover peaks
03Power cabinet240 kW–1.6 MW shared across terminals
04Charging pointsWhere vehicles connect
Digital operations

Billing residents and visitors

Operate

Monitor every charger, session and fault from one place.

Manage

Users, tariffs, access rules and multi-site visibility.

Integrate

OCPP to a CPO backend, or our platform end to end.

Monetise

Billing, reporting and the data behind utilisation.

Explore Software & EMS
AONENG Smart Energy Cloud Live
  • Overview
  • PV
  • Energy Storage
  • Charging
  • Load
  • Alarms
3.24MWPV generation+12%
2.61MWEnergy storage+8%
1.28MWCharging load+15%
4.83MWSite load+6%
0.21MWGrid import-9%
Power trendToday
Site loadPVMW
52.50
00:0006:0012:0018:0024:00
Equipment91% normal
  • Normal62
  • Warning4
  • Fault2
  • Offline0
Energy today28.6 MWh
  • PV12.4
  • Storage6.8
  • Charging5.1
  • Load4.3
Illustration of the Smart Energy Cloud interface. Figures shown are representative of a single site.
Project delivery & technical validation

From site study to lifecycle support.

01Site study
02Engineering design
03 · gateFactory acceptance
04Delivery
05 · gateSite acceptance
06Commissioning
07Training
08Lifecycle support
RemoteMonitoring, diagnostics, fault alerts, remote reset and OTA.
Regional supportConfiguration, fault analysis and technical response.
On-siteInspection, maintenance and component replacement.
Factory escalationEngineering diagnosis, firmware and component support.
FAQ

Developer questions

Provision, shared parking and future capacity.

What charger power is typical for residential parking?

The correct power depends on local electrical capacity and parking duration. AONENG offers AC charging from 3.5 to 22 kW.

Can apartment chargers be managed centrally?

Connected charging can support central monitoring and user management where the project includes a charging-management platform.

Can billing or metering be added?

Metering and connected operation are available on relevant models; the final billing arrangement depends on the project and local requirements.

Should every parking bay receive the same charger power?

Not necessarily. The best design depends on expected adoption, vehicle dwell time and available electrical capacity.

Start a project

Design it in early

From a single charging site to a fleet depot, energy-storage system or high-power charging network, our team can help define the right solution.