Most DC charger comparisons start with the headline power figure. That number matters, but on its own it rarely tells you which charger fits a site. The better starting point is the site itself — who arrives, how long they stay, and how much power the connection can actually deliver.

1. Start with the vehicles

A charger can only deliver what the vehicle accepts. A car limited to 100 kW will charge at about 100 kW on a 360 kW unit. Battery size, state of charge and temperature reduce that figure further as a session goes on.

List the vehicles you expect: passenger cars, vans, buses or heavy trucks; 400 V or 800 V battery systems; and the connector standard used in your market. That list sets the realistic power ceiling for each bay.

Charger rating vs what the vehicle takes (example)

Charger rating360 kW
Vehicle maximum150 kW
Average over session~100 kW
The session runs at the lower of the two figures — and falls further as the battery fills.

2. Match power to dwell time

How long a vehicle stays decides how much power it needs. A guest staying overnight needs far less power than a driver stopping for twenty minutes on a highway.

Typical staySite examplesUsual choice
Under 30 minutesHighway, urban fast-charging hubUltra-fast DC · 120–400 kW
30–90 minutesRetail, restaurants, fleet top-upsDC fast · 30–160 kW
Several hoursOffices, hotels, universitiesAC · 7–22 kW
Overnight, many vehiclesBus and truck depotsSplit DC group · 240 kW–1.6 MW
The right charger is the one that serves the vehicles you actually have, in the time they actually stay.

3. Check what the grid connection can deliver

Add up the peak demand of every charger running at once and compare it with the site’s available capacity. If the numbers don’t fit, there are three common answers:

  • Shared power. A split system feeds several terminals from one power cabinet and moves power to the vehicles that need it.
  • Load management. Software keeps total charging demand within an agreed limit.
  • Battery storage. A BESS charges slowly from the grid and releases energy quickly during charging peaks.

4. Plan for growth

It is far cheaper to lay cable routes, ducts and switchgear space once than to dig up a car park later. Size the electrical infrastructure for the next phase, even if you install fewer chargers on day one.

Questions to settle before you buy

  • How many vehicles will arrive in the busiest hour?
  • Which vehicles need the fastest turnaround?
  • What will the site look like in three to five years?

5. Where AONENG fits

Once the site questions are answered, the product choice narrows quickly.

FAQ

Is a higher-power charger always better?

No. It only helps if the vehicles can accept the power and the site can supply it. Otherwise you pay for capacity you never use.

Can I mix AC and DC chargers on one site?

Yes. Mixed sites are common where different users stay for different lengths of time.

What if the grid connection is too small?

Shared-power systems, load management and battery storage can each help keep demand within the available capacity.

Keep reading

All insights →
Public charging stationEV CHARGING FUNDAMENTALSWhy charger kW is only part of the charging-speed questionIn preparation
Solar carport with storageBESS FUNDAMENTALSWhen BESS helps an EV charging siteIn preparation
Heavy-truck depotFLEET ELECTRIFICATIONHow shared-power charging works in fleet depotsIn preparation